MRP와 JIT에 부합하는 DBR 제약일정계획문제 해법
Solution of the Drum-Buffer-Rope Constraint Scheduling Problems incorporated by MRP/JIT -

김진규   (주성대학 공업경영학과UU0001312  );
  • 초록

    The drum-buffer-rope(DBR) system is a finite scheduling mechanism that balances the flow of the production system. DBR controls the flow of materials through the plant in order to produce products in accordance with market demand, with a minimum of manufacturing lead time, inventory, and operating expenses. This paper integrates the best of MRP push system and JIT pull system with DBR system, efficiently adapts these logics to capacity constraint resources, and contributes to the evolution of synchronous manufacturing. The purpose of this paper is, thus, threefold. The first objective is to identify the frame of theory of constraints(TOC) and the logic of DBR scheduling. The second objective is to formulate the DBR constraint scheduling problems(DBRCSP) in a job shop environments. Finally, the paper is to suggest the solution procedure of DBRCSP for embedding TOC into MRP/JIT along with an numerical expression. In addition, illustrative numerical example is given.


 저자의 다른 논문

  • 김진규 (3)

    1. 2000 "품질인증시스템과 6시그마의 통합적 추진에 관한 연구" 산업경영시스템학회지 = Journal of society of Korea industrial and systems engineering 23 (57): 63~76    
    2. 2002 "제품안전 및 신뢰성 향상을 통한 제조물책임 예방대책" 산업공학 = IE Interfaces 15 (3): 270~278    
    3. 2003 "WTO/TBT 협정에 따른 KS 규격의 부합화에 관한 연구" 산업경영시스템학회지 = Journal of society of Korea industrial and systems engineering 26 (4): 12~22    

 활용도 분석

  • 상세보기

    amChart 영역
  • 원문보기

    amChart 영역

원문보기

무료다운로드
  • NDSL :
유료다운로드

유료 다운로드의 경우 해당 사이트의 정책에 따라 신규 회원가입, 로그인, 유료 구매 등이 필요할 수 있습니다. 해당 사이트에서 발생하는 귀하의 모든 정보활동은 NDSL의 서비스 정책과 무관합니다.

원문복사신청을 하시면, 일부 해외 인쇄학술지의 경우 외국학술지지원센터(FRIC)에서
무료 원문복사 서비스를 제공합니다.

NDSL에서는 해당 원문을 복사서비스하고 있습니다. 위의 원문복사신청 또는 장바구니 담기를 통하여 원문복사서비스 이용이 가능합니다.

이 논문과 함께 이용한 콘텐츠
이 논문과 함께 출판된 논문 + 더보기