Classify and Quantify Cumulative Impact of Change Orders On Productivity Using ANN Models

이민재    (충남대학교 공과대학 토목공학과  );
  • 초록

    Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.


  • 주제어

    Change Orders .   Cumulative Impact .   Productivity .   Claims .   ANN Model.  

  • 참고문헌 (16)

    1. Hanna, Awad S., Jefferey S. Russell, Timothy W. Gotzion, and Erik V. Nordheim. (1999b) 'Impact of Change Orders on Labor Efficiency for Mechanical Construction,' Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, May/Jun., pp. 176-184 
    2. Hanna, A. S., Lotfallah, W. B., and Lee, M. J. (2002)'. Statistical- Fuzzy Approach to Quantify Cumulative Impact of Change Orders,' Journal of Computing in Civil Engineering, American Society of Civil Engineers (ASCE), Vol. 16, No.4, October 2002, pp. 252-258 
    3. Hanna, A. S., Camlic R., Peterson, P. A., and Lee, M. J.(2004). 'Cumulative Effect of Project Changes for Electrical and Mechanical Construction,' Journal of Construction Engineering and Management, ASCE, Vol. 139, No. 6, Nov./Dec, pp. 762-771 
    4. Haykin, S. (1994). Neural Networks: A Comprehensive Foundation, MacMillan College Publishing Co., New York 
    5. Lee, M. J., Hanna, A. S., and Loh, W. Y. (2004). 'Decision Tree Approach to Classify and Quantify Cumulative Impact of Change Orders On Productivity,' Journal of Computing in Civil Engineering, ASCE, Vol. 18, No. 2, April, pp. 132-144 
    6. Cushman, Robert, and Stephen Butler. (1994). Construction Change Order Claims, John Wiley and Sons, Inc., Somerset, NJ 
    7. Moselhi, O. (1998). 'Estimating the Cost of Change Orders' 1998 AACE International Transactions, Morgantown, WV:AACE International 
    8. Construction Industry Institute. (1990).' The Impact of Changes on Construction Cost and Schedule,'Publication 6-10, April, University of Texas at Austin, Austin, Texas 
    9. Schwartzkopf, William. (1995). Calculating Lost Labor Productivity in Construction Claims, John Wiley & Sons, Inc., Somerset, NJ 
    10. Civitello, Andrew M. (1987). Contractor's Guide to Change Orders, Prentice-Hall, Inc., Englewood Cliffs 
    11. Lee, M. J.(2002). 'Artificial Intelligence Approach to Classify and Quantify Cumulative Impact of Change Orders on Labor Productivity,'Ph.D. Dissertation, University of Wisconsin- Madison, Madison, WI 
    12. Hanna, Awad S., Jefferey S. Russell, Erik V. Nordheim, and Mathew J. Bruggink. (1999a). 'Impact of Change Orders on.' Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 4, Jul./Aug., pp. 224-232 
    13. Hanna, Awad S. (2001). 'Quantifying The Cumulative Impact of Change Orders for Electrical and Mechanical Contractors.' Research Report 158-11, February, Construction Industry Institute (CII), University of Texas at Austin, Austin, TX 
    14. Ibbs, C.W. and Walter E. Allen. (1995)'. Quantitative Impacts of Project Change.'Source Document108, May, Construction Industry Institute, University of Texas at Austin, Austin, TX 
    15. Leonard, Charles A. (1988). 'The Effects of Change Orders on Productivity.'Masters Thesis, Concordia University, Montreal, Quebec, Canada 
    16. Werbos, P. (1974). 'Beyond Regression: New Tools for Prediction and Analysis in the Behavioral Sciences,'PhD thesis, Department of Applied Mathematics, Harvard University, Cambridge, Massachusetts 
  • 이 논문을 인용한 문헌 (1)

    1. Lee, Min-Jae ; Park, Bum-Jin ; Im, Keon-Soon 2008. "A Study on the Estimation of Change Orders Impact for the Public Construction" 大韓土木學會論文集, Journal of the Korean Society of Civil Engineers, D. 교통공학, 도로공학, 시공관리, 정보기술, 지역 및 도시계획, 철도공학, 측량 및 지형공간정보공학, 28(d3): 363~369     

 저자의 다른 논문

  • 이민재 (11)

    1. 2005 "Schedule Delay Claims and Analysis - Yong I. LEE (U.S.A., Senior Scheduler/ Claims Analyst, Summit Associates) -" 건설관리 : 한국건설관리학회 학회지 = Construction engineering and management 6 (6): 27~28    
    2. 2008 "[구두발표 논문] Track V : VE.LCC(Value Engineering.life Cycle Cost)" 건설관리 : 한국건설관리학회 학회지 = Construction engineering and management 9 (6): 48~51    
    3. 2008 "공공건설공사 설계변경에 따른 손실 추정에 관한 기초연구" 大韓土木學會論文集, Journal of the Korean Society of Civil Engineers, D. 교통공학, 도로공학, 시공관리, 정보기술, 지역 및 도시계획, 철도공학, 측량 및 지형공간정보공학 28 (d3): 363~369    
    4. 2011 "건설 정보화 및 BIM" 건설관리 : 한국건설관리학회 학회지 = Construction engineering and management 12 (6): 11~18    
    5. 2013 "도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발" 한국건설관리학회논문집 = Korean journal of construction engineering and management 14 (4): 164~171    
    6. 2015 "수자원시설 건설공사 표준공기 산정을 위한 기초연구" 한국건설관리학회논문집 = Korean journal of construction engineering and management 16 (1): 35~43    
    7. 2016 "교량 유지관리 의사결정 지원을 위한 개축비용 산정모델 개발" 한국산학기술학회논문지 = Journal of the Korea Academia-Industrial cooperation Society 17 (9): 533~542    
    8. 2018 "건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정" 한국산학기술학회논문지 = Journal of the Korea Academia-Industrial cooperation Society 19 (12): 669~676    
    9. 2018 "기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구" 한국산학기술학회논문지 = Journal of the Korea Academia-Industrial cooperation Society 19 (12): 677~685    

 활용도 분석

  • 상세보기

    amChart 영역
  • 원문보기

    amChart 영역

원문보기

무료다운로드
  • NDSL :
유료다운로드
  • 건축도시연구정보센터 : 저널

유료 다운로드의 경우 해당 사이트의 정책에 따라 신규 회원가입, 로그인, 유료 구매 등이 필요할 수 있습니다. 해당 사이트에서 발생하는 귀하의 모든 정보활동은 NDSL의 서비스 정책과 무관합니다.

원문복사신청을 하시면, 일부 해외 인쇄학술지의 경우 외국학술지지원센터(FRIC)에서
무료 원문복사 서비스를 제공합니다.

NDSL에서는 해당 원문을 복사서비스하고 있습니다. 위의 원문복사신청 또는 장바구니 담기를 통하여 원문복사서비스 이용이 가능합니다.

이 논문과 함께 이용한 콘텐츠
이 논문과 함께 출판된 논문 + 더보기