Conflicting Factors in Korean Construction Industry

Acharya Nirmal K.    (Dept. of Civil Engg, Pukyong National Univ.   ); Lee, Young-Dai   (Dept. of Civil Eng, Pukyong National Univ.  ); Kim, Jung-Ki   (Dept. of Civil Eng, Pukyong National Univ.  );
  • 초록

    Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results show that ANN models give significantly improved performance compared to traditional statistical models.


  • 주제어

    Construction Projects .   Conflicting Factors .   Disputes .   Successful Project .   Korea.  

  • 참고문헌 (24)

    1. Fenn, P., Lowe, D. and Speck, C. (1997), 'Conflict and dispute in construction,' Construction Management and Economics, (T & F Spon), Vol. 15 (6), 513-518 
    2. Hyperstat Online (2005), 'Chapter 12 Introduction to ANOVA,' (June 27, 2005) 
    3. O'Brien, J. J. (1998), 'Construction Change Orders: impact, avoidance, documentation,' McGraw ? Hill 
    4. Pezzullo, J.C. (2005), http://Pezzullo.net 
    5. McCallum, M.H., (2000), 'A quick premier on construction risks and contracting practices', Associated general contractors of America (AGC), USA 
    6. Epstein, R.C. (2004), 'How construction contracts cause litigation', Alert, Greenberg Traurig, USA (February), http://www.gtlaw.com/pub/alerts/2004/epsteinr_02.pdf (retrieved on July 4, 2005) 
    7. Stipanowich, T.J., and Matthews, W.L. (1997), 'At the cutting edge: conflict avoidance and resolution in the US construction industry,' Construction. Management and Economics, Vol. 15 (6), 505-512 
    8. Chan, E.H.W., and Suen, C.H. (2005), 'Disputes and dispute resolution systems in Sino-foreign joint venture construction projects in China,' Journal of Professional Issues and Engineering Education and Practice (ASCE), Vol. 131 (2), 141-148 
    9. Kim, Y.B. (2003), 'To get what you want, push the government around,' The Korea Economic Daily, Vol. 29, No.829 
    10. Fisk, E.R. (2000), Construction project administration, (6th Ed.), Prentice - Hall 
    11. 'South Korean construction posts solid growth work in 2003,' (2004), Asia Pulse Yahoo Inc., (August 18), http://au.news.yahoo.com/040818/3/qdcv.html> 
    12. Levy, S.M. (2000), Project management in construction, (3rd Ed.) McGraw-Hill 
    13. Barrie, D.S. and Paulson, B. C. Jr. (1992), Professional Construction Management (3rd Ed.), McGraw-Hill Inc 
    14. Breen, M. (2004), 'Korea's protest culture,' Invest Korea Journal, Nov-Dec 
    15. Fenn, P. (2002), 'Why construction contracts go wrong (or an aetiological approach to construction disputes)', A paper given at a meeting of the society of construction law in Derbyshire on 5th March 2002), Society of construction law, www.scl.org.uk 
    16. Kartam, N.A. and Kartam, S.A. (2001). 'Risk and its management in the Kuwaiti construction industry: a contractors' perspective,' International Journal of Project Management, Vol.19 (6), 325-335 
    17. Awakul, P., and Ogunlana, S.O., (2002), 'The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study,' Construction Management and Economics, (T & F Spon), Vol. 20 (4), 365-377 
    18. Green Korea-Save Saemangeum (2005), 'Letter to President Roh,' (July 7, 2005) 
    19. Cho, Y. (2003), 'The organizational boundaries of housebuilding firms in Korea,' Construction Management and Economics, Vol. 21 (7), 671-680 
    20. Long, N.D., Ogunlana, S., Quang, T., and Lam, K.C. (2004), 'Large construction projects in developing countries: a case study from Vietnam,' International Journal of Project Management, (Elsevier), Vol. 22 (7), 553-561 
    21. Ogleysby, C.H., Parker, H., and Howell, G. (1989), 'Productivity improvement in construction', McGraw-Hill Inc 
    22. Rahman, M.M. and Kumaraswamy, M.M. (2004). 'Contracting Relationship trends and Transitions,' Journal of Management in Engineering, Vol. 20 (4), 147-161 
    23. Gardiner, P.D., and Simmons, J.E.L., (1998). 'Conflict in smalland medium-sized projects: Case of partnering to the rescue,' Journal of management in engineering, Vol. 14, No. 1, pp 35-40 
    24. Loosemore, M. (1999), 'Responsibility, power and construction conflict', Construction management and economics, Vol. 17, pp. 699-709 
  • 이 논문을 인용한 문헌 (1)

    1. 2006. "" 건설관리 : 한국건설관리학회논문집 = Korean journal of construction engineering and management, 7(5): 177~190     

 활용도 분석

  • 상세보기

    amChart 영역
  • 원문보기

    amChart 영역

원문보기

무료다운로드
  • NDSL :
유료다운로드
  • 건축도시연구정보센터 : 저널

유료 다운로드의 경우 해당 사이트의 정책에 따라 신규 회원가입, 로그인, 유료 구매 등이 필요할 수 있습니다. 해당 사이트에서 발생하는 귀하의 모든 정보활동은 NDSL의 서비스 정책과 무관합니다.

원문복사신청을 하시면, 일부 해외 인쇄학술지의 경우 외국학술지지원센터(FRIC)에서
무료 원문복사 서비스를 제공합니다.

NDSL에서는 해당 원문을 복사서비스하고 있습니다. 위의 원문복사신청 또는 장바구니 담기를 통하여 원문복사서비스 이용이 가능합니다.

이 논문과 함께 출판된 논문 + 더보기