설계단계에서의 설계변경에 따른 설계추가용역비 산정방안에 관한 연구
A Study on Estimation Method of Design Additional Fee by Change Order on Design Stage

박원호   심재광   백준홍  
  • 초록

    Typically, change order happens in construction stage, but often occurs in design stage due to owner"s requirement. At once, design additional fee is raised, but design additional fee estimation methods of domestic are not objectively and confidently. Therefore, this study proposed the estimation method that distributes the ratio in detail activity of qualified architect work scope and calculates the design additional cost by multiplying full design cost and the ratio. The estimation method applied to K project and confirmed the estimated design additional fee to be within negotiation of real case. However this study needs the more case study and actual and objective activity ratio. Eventually, this study expects that the owner easily utilizes and applies the estimation method.


  • 주제어

    설계단계 .   설계변경 .   설계추가용역비 .   비율 .   Design Stage .   Change Order .   Design Additional Cost .   Ratio.  

 활용도 분석

  • 상세보기

    amChart 영역
  • 원문보기

    amChart 영역

원문보기

무료다운로드
  • 원문이 없습니다.
유료다운로드

유료 다운로드의 경우 해당 사이트의 정책에 따라 신규 회원가입, 로그인, 유료 구매 등이 필요할 수 있습니다. 해당 사이트에서 발생하는 귀하의 모든 정보활동은 NDSL의 서비스 정책과 무관합니다.

원문복사신청을 하시면, 일부 해외 인쇄학술지의 경우 외국학술지지원센터(FRIC)에서
무료 원문복사 서비스를 제공합니다.

NDSL에서는 해당 원문을 복사서비스하고 있습니다. 위의 원문복사신청 또는 장바구니 담기를 통하여 원문복사서비스 이용이 가능합니다.

이 논문과 함께 출판된 논문 + 더보기