Transient thermo-mechanical analysis of steam generators for solar tower plants

González-Gómez, P.A. (Corresponding author. ) ; Gómez-Hernández, J. ; Briongos, J.V. ; Santana, D. ;
  • 초록  

    Abstract In solar power tower plants, fast start-ups and/or load changes are mandatory to increase the power plant dispatchability. The high temperatures of the working fluids and the partial-load operation will reduce the lifetime of the thick-walled components at the steam generator. Therefore, a proper heat exchanger design should consider the stress evolution during the transient operation of the plant. This work addresses, for the first time, a methodology to determine the dynamic behavior of all heat exchangers of a steam generator train. The methodology proposed here is a powerful tool for the design of solar power plants. The stress analysis model identifies the most important components of the steam generation train during transient operation. The methodology consists of the combination of analytical models to obtain the coupled response of the steam generation train from the following dynamic variables: temperature, pressure and stress. An example of this methodology is presented for two start-up initial conditions: the assumption of non-isothermal and isothermal temperature profiles of the heat exchangers. A steam generator train based on conventional shell and tube heat exchangers is analyzed. The analysis shows that the non-isothermal condition takes approximately 50 min to reach nominal conditions, whereas the isothermal condition takes approximately 110 min, requiring 600 tons and 716 tons of hot salt to perform the start-up procedure, respectively. Highlights Thermal-stress modeling of the steam-generator dynamic behavior for a solar tower plant. The highest stresses occur in the superheater tubesheet junction. High stresses were found under part-load conditions instead of nominal conditions. Start-up takes between 50 min and 110 min, depending on the steam-generator initial-condition. Between 600 tons and 716 tons of hot salt are needed for the start-up procedure.


  • 주제어

    Solar power tower plant .   Steam generator .   Start-up procedures .   Thermal stress analysis.  

 활용도 분석

  • 상세보기

    amChart 영역
  • 원문보기

    amChart 영역

원문보기

무료다운로드
  • 원문이 없습니다.

유료 다운로드의 경우 해당 사이트의 정책에 따라 신규 회원가입, 로그인, 유료 구매 등이 필요할 수 있습니다. 해당 사이트에서 발생하는 귀하의 모든 정보활동은 NDSL의 서비스 정책과 무관합니다.

원문복사신청을 하시면, 일부 해외 인쇄학술지의 경우 외국학술지지원센터(FRIC)에서
무료 원문복사 서비스를 제공합니다.

NDSL에서는 해당 원문을 복사서비스하고 있습니다. 위의 원문복사신청 또는 장바구니 담기를 통하여 원문복사서비스 이용이 가능합니다.

이 논문과 함께 출판된 논문 + 더보기