본문 바로가기
HOME> 논문 > 논문 검색상세

논문 상세정보

Procedia CIRP v.72, 2018년, pp.796 - 801  

Pilot To Full-Scale Production: A Battery Module Assembly Case Study

Chinnathai, Malarvizhi Kaniappan    (Warwick Manufacturing Group (WMG), University of Warwick, Coventry, West Midlands, CV4 7AL, UK   ); Alkan, Bugra    (Warwick Manufacturing Group (WMG), University of Warwick, Coventry, West Midlands, CV4 7AL, UK   ); Vera, Daniel    (Warwick Manufacturing Group (WMG), University of Warwick, Coventry, West Midlands, CV4 7AL, UK   ); Harrison, Robert    (Warwick Manufacturing Group (WMG), University of Warwick, Coventry, West Midlands, CV4 7AL, UK  );
  • 초록  

    Abstract Electric vehicles are currently on the rise due to environmental and legal concerns. Furthermore, improvements made in battery assembly steadily boosts the efficiency of electric vehicles. A well-prevalent method to overcome the uncertainties that emerge from the ever-changing battery technology, is to assemble products using pilot production lines. However, literature pertaining to the scale-up of pilot production lines for full scale production is scarce. Therefore, in this paper, potential scale-up scenarios for battery module assembly line are proposed in a discrete event simulation software and results are compared. Furthermore, the benefits of the proposed method are discussed with a test case.


  • 주제어

    Cyber-Physical Systems .   Battery module assembly .   Pilot production.  

 활용도 분석

  • 상세보기

    amChart 영역
  • 원문보기

    amChart 영역

원문보기

유료 다운로드의 경우 해당 사이트의 정책에 따라 신규 회원가입, 로그인, 유료 구매 등이 필요할 수 있습니다. 해당 사이트에서 발생하는 귀하의 모든 정보활동은 NDSL의 서비스 정책과 무관합니다.

원문복사신청을 하시면, 일부 해외 인쇄학술지의 경우 외국학술지지원센터(FRIC)에서
무료 원문복사 서비스를 제공합니다.

NDSL에서는 해당 원문을 복사서비스하고 있습니다. 위의 원문복사신청 또는 장바구니 담기를 통하여 원문복사서비스 이용이 가능합니다.

이 논문과 함께 출판된 논문 + 더보기